Mountain Stream Engineering (building up) is used to protect local area from flooding, it should prevent stream bed from all types of water erosion.
1) Plan view PDF at mountain stream Cicha Woda in Polish ski resort Zakopane (Tatra Mountains)
2) Graphical visualization of all required ground works PDF (based on calculations in technical report)
3) Profile of the stream with natural an engineered elements with their attributes PDF, from the top you can see as follow: – comparative level (al levels are based on elevation above main sea level in meters AMSL) – elevation of the right bank (AMSL) – elevation of the left bank (AMSL) – elevation of existing watercourse bed in the stream’s current (AMSL) – elevation of the watercourse bed in the axis of the designed rute (AMSL) – designed slopes – elevation of designed stream bed – engineered elements of the designed route – distances and hectometers (chainage) Please e-mail me if you are interested in PDF or CAD copy with technical description on which the drawings are based.
4) Technical Description PDF
5) Cross sections PDF
Drawings:
Plan view PDF of a mountain stream Cicha Woda with engineered solutions and designed route
Graphical visualization of all required ground works PDF
Profile of the stream with natural an engineered elements with their attributes PDF,
Technical Description PDF
Cross sections PDF